|
This is how the community would cross the river currently, during the dry season. |
The EWB-UD team at a meeting with the community discussing their wants/needs. |
|
Soil testing. |
Surveying during the January 2011 assessment trip. |
|
The village side of the river bank at the bridge site. |
A team member presenting a Memorandum of Understanding to the Community. |
|
This is the crop side of the bridge site. As you can see, there is a steep hill coming up from this side which limits the type of vehicle that can get down. |
Community members will often wade across the river during the dry season. |